Monday, November 9, 2009


Milestone 6 went well. The group all came together and did our part to get ready to manufacture our most critical module: arm.
The analysis was similar to the analysis done in the design review. Modifications were made and the arm dimensions were re-evaluated. Bill of parts and manufacturing process was put together in table form. The arm itself was designed on solidworks and engineering drawings were made from it, which will be posted later.